D Form Civil were engaged by FRR Cinels to aid with construction of the new transformer bay in the Wodonga Terminal Station. The new transformer will be replacing an older version and aims to provide power for the Albury/Wodonga area.

Our team was called in to complete the Form, Reo, and Pour package (FRP) for the new transformer’s foundation and the surrounding concrete works in the area. This included concrete foundation works (strip, pad, and transformer footings), multiple apron concrete slabs, an in-situ cable trench, a spoon drain, a strong slab, and a rollover bund.

D Form Civil worked alongside FRR Cinels and PowerNet to complete the scope of works on time and with little to no complications.