D Form Civil were engaged in the new St Peter Apostle Primary school build located in Hoppers Crossing in Victoria by our client Midsons. The project was to deliver a new build on the grounds of the existing primary school to provide a larger learning centre for the ever growing population in the area.

The team were assigned with delivering the full civil and structural scope of works which included the formwork, reinforcement and concrete. The project scope included the completion of all the foundations, 2 floor slabs, 2 sets of in-situ concrete stairs, a lift shaft and 4 circular columns throughout the 500m2 building. 

Some challenges were encountered along the way including unfavourable ground conditions leading to the foundations of the building being modified to suit with some small design changes. The High quality seen in the finished product of the school is a testament to the ability and drive in all of the members of the D Form Civil team.

Get in touch
Leave a message below and we’ll get in touch with you shortly.