As part of the major accommodation upgrade for Monash University, Clayton campus, D Form Civil where awarded the contract to deliver the in-situ curved feature walls located within the external recreation zone of the student accommodation.
Some of the main challenges faced on the ground where delivering the complex designs with a distinct look and identity. To obtain the high standard concrete finish desired, this required high-level strategic planning of materials and resources. The sequencing of production of prefabrication moulds before commencing works was instrumental in achieving the tight timeframe for this scope of work.