Construction of a new 220kV Shunt Reactor Enclosure and new bay of 220kV Switchyard Footings. The scope included:

  • Shunt Reactor Slab Construction
  • Precast Firewall Supply and Installation
  • Transformer Apron Slab
  • Environmental Drainage
  • Stormwater Drainage
  • 24 No. Piled Foundations
  • Conduit Installations
  • Switchyard Resurfacing