One of our earliest projects for Bild Group was the Grices Rd bridge replacement. D Form Civil were commissioned to complete the formwork, Reo and Pour Package (FRP) of two new 2-lane bridges that were designed to replace the existing 2-lane bridge. 

The scope of works for each bridge structure included:

  • 2 in-situ reinforced concrete bridge abutments with wingwalls.
  • 2 in-situ reinforced concrete bridge approach slabs.
  • In-situ reinforced concrete bridge Deck slab with kerb and guard rail HDB’s.
  • Grouting of PSC planks.

The team were able to deliver a high quality project in a time efficient manner to help cater for the increased traffic overflow from expanding residential developments in the surrounding areas.