Rushworth Bridge

D Form Civil were engaged by our client Bild Group to complete a bridge replacement project in regional Victoria. The project was to replace the existing bridge on the Rushworth-Girgarre Road, due to its age and size, with a larger more efficient bridge. The project consisted of demolishing the existing bridge while simultaneously constructing the new bridge in a timely manner to re-open that stretch of roadway.

The D Form Civil package comprised of the full formwork, Reo and Pour Package (FRP) of the new bridge structure. This entailed 2 bridge abutments, the bridge deck/kerb and diaphragm, the landing of the Super T beams, walkway construction with temporary handrail and 2 approach slabs. The team used the conventional formwork method for construction of the abutments which allowed for speedy construction and re-use for the deck/diaphragm pour. The team were faced with below zero temperatures during the construction of the deck and had to improvise by implementing thermal blankets to meet Vic Roads specification and deliver a high-quality finished product.

Get in touch
Leave a message below and we’ll get in touch with you shortly.

Grices Rd Bridges

One of our earliest projects for Bild Group was the Grices Rd bridge replacement. D Form Civil were commissioned to complete the formwork, Reo and Pour Package (FRP) of two new 2-lane bridges that were designed to replace the existing 2-lane bridge. 

The scope of works for each bridge structure included:

  • 2 in-situ reinforced concrete bridge abutments with wingwalls.
  • 2 in-situ reinforced concrete bridge approach slabs.
  • In-situ reinforced concrete bridge Deck slab with kerb and guard rail HDB’s.
  • Grouting of PSC planks.

The team were able to deliver a high quality project in a time efficient manner to help cater for the increased traffic overflow from expanding residential developments in the surrounding areas.

Get in touch
Leave a message below and we’ll get in touch with you shortly.

Cloverton Estate – Merri Creek

D Form Civil were engaged by our client Entracon in a new bridge construction package located in Donnybrook. The new bridge construction follows a large residential movement to the Northern suburbs of Melbourne with the increased volume of traffic in the area leading to the demand for a more sustainable free flow of traffic while also providing alternative access to all residents in the surrounding area.

Our team were commissioned to complete the scope of full formwork, Reo and Pour Package (FRP) of the new bridge structure. This involved the construction of 2 bridge abutments and wingwalls, 8 pier columns and 2 pier crossheads using a combination of a Peri falsework/Peri formwork system. The team overcame adverse weather conditions, which caused the site to flood numerous times, and were able to deliver the full package of works to a high-quality standard within the set deadlines.

Get in touch